Title 16 ENVIRONMENTAL AND RESOURCE PROTECTION
Chapter 16.52 TIMBER HARVESTING REGULATIONS
16.52.039 Public noticing.
Public Notice shall be required for Timber Harvesting Notices and Minor
Timber Harvest Permit applications. The intent of the noticing is to provide
information to adjacent residents about the approved operation.
(a) The
Notice form shall be at least 8.5” by 11” and shall contain the
following information:
(1) The name of the landowner.
(2) The name and
phone number of the County staff member handling the application.
(3) The
application number.
(4) Identification of the property, including a map
which describes the nearest cross streets and roads, where the operations are
proposed. This identification must be an address or assessor’s parcel
number.
(5) A description of the proposed operation, including amount and
location of timber to be cut; harvesting methods to be used, including the
listing of any heavy equipment, haul route, approximate number of loads to be
removed and schedule of operations.
(6) The notice shall be sent to the
water purveyor supplying water to the parcel upon which timber operations are
proposed.
(b) The notice shall be posted on site by the applicant in
accordance with current County procedures. Posting shall occur in at least four
locations, including, but not necessarily limited to, the following:
(1) At
the location where the haul road enters the property.
(2) Along the haul
route at no less than 1/2 mile intervals, until the haul route joins a publicly
maintained road. An additional notice shall be placed at said
intersection.
(3) At any location(s) along the perimeter of the property on
which operations will take place, where the operation will be easily visible
from adjoining, inhabited parcels; except that notices are not required to be
posted at less than 500-foot intervals.
(c) Posting of the notices shall
coincide with submission of a Timber Harvesting Notice or application for a
Minor Timber Harvest Permit to the County. The Timber Harvest Notice or Minor
Timber Harvest Permit application shall contain a statement certifying that
these notices have been posted.
(d) The notices shall remain posted until
operations and final site clean up are completed.
<< previous | next >>