Chapter 18.28 BUILDING PERMITS

18.28.010 Subdivisions generally.

18.28.020 Subdivisions with minor improvements.

18.28.030 Subdivisions with major improvements.

18.28.040 Occupancy.

18.28.050 Consolidation map.


18.28.010 Subdivisions generally.

Building permits for the erection of buildings in a subdivision will be issued upon the final approval of improvements required by section 18.20.270. (Ord. 789 § 1 (part), 1974: prior code § 11-1.18(a))

18.28.020 Subdivisions with minor improvements.

Building permits for the erection of buildings in a subdivision where only minor improvements are required may be issued prior to final approval of improvements required by section 18.20.270, where the director is satisfied all of the following conditions are met:

A. The lot is serviced by a street adequate to provide access thereto;

B. The lot may be adequately served by the existing water system and existing sewer or other sanitary system;

C. Service laterals for water, sewer and electricity as well as sidewalks, curbs and gutter and other minor improvements as required will be completed within three months from the issuance of a building permit, or within a longer period where the subdivider shows by a construction schedule or otherwise that more than three months is required for the erection of the building; and

D. The construction of subdivision improvements is bonded pursuant to sections 18.20.180 through 18.20.220. (Ord. 789 § 1 (part), 1974: prior code § 11-1.18(b))

18.28.030 Subdivisions with major improvements.

Building permits for the erection of buildings in a subdivision where major improvements are required may be issued prior to the final approval of improvements required by section 18.20.270, in the following situations:

A. For a building to be used as a model home;

B. For buildings to be constructed by or on behalf of the subdivider and intended to be sold, leased, or rented together with the lot;

C. Where the director is satisfied by the construction schedule of the subdivider, or otherwise, that the building will not be completed before improvements to the subdivision are completed and all subdivision improvements are bonded pursuant to sections 18.20.180 through 18.20.220. (Ord. 789 § 1 (part), 1974: prior code § 11-1.18(c))

18.28.040 Occupancy.

Occupancy of any building in a subdivision will not be allowed until and after final approval of improvements required by section 18.20.270 is given; provided, however, that where the director, the director of public works, the director of water supply, the sanitary engineer and other involved officials are satisfied that there will be no detriment to the public health, safety or general welfare, and an occupancy permit has been issued, buildings may be occupied prior to final approval of improvements required by section 18.20.270. (Ord. 789 § 1 (part), 1974: prior code § 11-1.18(d))

18.28.050 Consolidation map.

A. When a building or a group of buildings forming a singular development is contemplated in two or more contiguous lots in a manner that the common boundary line is disregarded, or when any one of the lots is substandard in size or width, then a consolidation map shall be filed prior to the issuance of a building permit. Improvements shall not be required for the approval of the consolidation; provided, however, should the consolidation be followed by a resubdivision establishing more lots than in existence prior to the consolidation, then improvements according to this title shall be required.

B. The director may approve the building permit should the preliminary consolidation plat conform basically to the requirements of the final plat; revisions to the consolidation plat for strict conformance of the final plat shall be made by the subdivider and filed with and approved by the director prior to the occupancy of the building. (Ord. 789 § 1 (part), 1974: prior code § 11-1.19)